HOW IT WAS: Much work occurred before Canfield Fair opening ...

Galleries | Videos | Audio | Documents

Photo detail

Vindicator file photo, April 2009 | published: September 1, 2009

HOW IT WAS: Much work occurred before Canfield Fair opening day, including replacing the roofs of the Carriage Museum, 4-H Coliseum and Grange Building. The Carriage Museum’s construction, above, was the most expensive and took the longest. Built in 1975, it needed a new roof, floor and drain work.



Comments [+] – click to expand